{"id":1757,"date":"2026-11-19T08:00:00","date_gmt":"2026-11-19T08:00:00","guid":{"rendered":"https:\/\/dajicasting.com\/?p=1757"},"modified":"2026-11-19T08:00:00","modified_gmt":"2026-11-19T08:00:00","slug":"burner-nozzle-bodies-sample-qualification","status":"publish","type":"post","link":"https:\/\/dajicasting.com\/fr\/burner-nozzle-bodies-sample-qualification\/","title":{"rendered":"Corps des buses de br\u00fbleur : qualification de l'\u00e9chantillon et approbation du premier article"},"content":{"rendered":"<div class=\"wp-block-rank-math-toc-block\" id=\"rank-math-toc\"><h2>Table des mati\u00e8res<\/h2><nav><ul><li><a href=\"#the-sample-qualification-decision-for-burner-nozzle-bodies\">The sample qualification decision for burner nozzle bodies<\/a><\/li><li><a href=\"#what-makes-burner-nozzle-bodies-a-distinct-casting-requirement\">What makes burner nozzle bodies a distinct casting requirement<\/a><\/li><li><a href=\"#a-practical-workflow-for-sample-qualification\">Un flux de travail pratique pour la qualification des \u00e9chantillons<\/a><\/li><li><a href=\"#worked-review-scenario-for-burner-nozzle-bodies\">Worked review scenario for burner nozzle bodies<\/a><\/li><li><a href=\"#plan-a-representative-production-trial\">Planifier un essai de production repr\u00e9sentatif<\/a><\/li><li><a href=\"#check-the-mating-assembly\">V\u00e9rifiez l'assemblage d'accouplement<\/a><\/li><li><a href=\"#review-changes-across-all-operations\">Review changes across all operations<\/a><\/li><li><a href=\"#treat-cleaning-as-a-specified-operation\">Traiter le nettoyage comme une op\u00e9ration sp\u00e9cifi\u00e9e<\/a><\/li><li><a href=\"#keep-development-and-production-economics-separate\">Gardez l\u2019\u00e9conomie du d\u00e9veloppement et de la<\/a><\/li><li><a href=\"#decision-checklist-before-release\">Liste de contr\u00f4le de d\u00e9cision avant la lib\u00e9ration<\/a><\/li><li><a href=\"#comparison-of-purchasing-decisions\">Comparaison des d\u00e9cisions d'achat<\/a><\/li><li><a href=\"#discuss-your-casting-drawing-with-daji\">Discutez de votre dessin de casting avec Daji<\/a><\/li><li><a href=\"#frequently-asked-questions\">Foire aux questions<\/a><\/li><\/ul><\/nav><\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"the-sample-qualification-decision-for-burner-nozzle-bodies\">The sample qualification decision for burner nozzle bodies<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Burner nozzle bodies need sample qualification that accounts for a nozzle passage and attachment feature exposed to process heat. The component may face oxidizing gases, thermal cycling and deposits; those conditions shape what must be defined before a purchase order can describe an acceptable part. This guide concentrates on the evidence and decisions needed for this specific stage. The intended result is a signed approval package defining what was actually validated.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Une approbation d'\u00e9chantillon doit expliquer quelle conception, quel processus, quelle r\u00e9vision d'outil et quelle condition fournie elle couvre La conformit\u00e9 dimensionnelle est une partie de cette approbation L'acheteur peut \u00e9galement avoir besoin de preuves mat\u00e9rielles, de performances, d'assemblage et de contr\u00f4le de production D\u00e9finir ces exigences avant que les \u00e9chantillons ne soient faits afin que l'essai puisse produire des informations repr\u00e9sentatives.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"what-makes-burner-nozzle-bodies-a-distinct-casting-requirement\">What makes burner nozzle bodies a distinct casting requirement<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The defining geometry is a nozzle passage and attachment feature exposed to process heat. Pay particular attention to orifice geometry and attachment alignment; these are the interfaces that can turn an apparently acceptable raw casting into an assembly problem. Review the load-bearing sections and the tool-access envelope together, because an improvement to one can make another harder to control.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The service review should address oxidizing gases, thermal cycling and deposits. Ask the equipment designer to identify the credible failure modes and the conditions used to validate them. The manufacturing priority is the specified material condition and passage cleanliness. Avoid selecting a heat-resistant alloy from room-temperature strength alone. That mistake can remain hidden in a nominal model and emerge only during a production trial or field installation.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"600\" height=\"650\" src=\"https:\/\/dajicasting.com\/wp-content\/uploads\/2026\/09\/new-energy-power-castings-related-scene.jpg\" alt=\"\u98ce\u529b\u53d1\u7535\u673a\u3001\u5149\u4f0f\u677f\u53ca\u7535\u529b\u8bbe\u65bd\u573a\u666f\" class=\"wp-image-1499\" srcset=\"https:\/\/dajicasting.com\/wp-content\/uploads\/2026\/09\/new-energy-power-castings-related-scene.jpg 600w, https:\/\/dajicasting.com\/wp-content\/uploads\/2026\/09\/new-energy-power-castings-related-scene-277x300.jpg 277w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"a-practical-workflow-for-sample-qualification\">Un flux de travail pratique pour la qualification des \u00e9chantillons<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Convenir de la quantit\u00e9 d'\u00e9chantillon et de la m\u00e9thode de s\u00e9lection, documenter le parcours complet du processus et inspecter toutes les caract\u00e9ristiques sp\u00e9cifi\u00e9es S\u00e9parer les r\u00e9sultats de laboratoire, dimensionnels et d'assemblage Enregistrer ouvertement les \u00e9carts et d\u00e9terminer si l'approbation est inconditionnelle, limit\u00e9e \u00e0 un essai ou subordonn\u00e9e \u00e0 une mesure corrective Pr\u00e9server les \u00e9chantillons de r\u00e9f\u00e9rence approuv\u00e9s lorsqu'ils ont un but clair.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Apply the workflow to burner nozzle bodies by recording a nozzle passage and attachment feature exposed to process heat as the component-specific feature under review. Assign the dimensional work to orifice geometry and attachment alignment and connect the release evidence to the specified material condition and passage cleanliness. Keep proposed changes visible until the responsible engineer approves them. The review should end with a signed approval package defining what was actually validated, rather than an unexplained statement that the drawing is acceptable.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"worked-review-scenario-for-burner-nozzle-bodies\">Worked review scenario for burner nozzle bodies<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Un \u00e9chantillon s\u00e9lectionn\u00e9 \u00e0 la main correspond \u00e0 l'assemblage, mais ses registres de production ne repr\u00e9sentent pas la voie pr\u00e9vue du lot L'\u00e9chantillon d\u00e9montre qu'une pi\u00e8ce peut s'adapter ; il n'\u00e9tablit pas la stabilit\u00e9 de la production Demandez des preuves repr\u00e9sentatives et identifiez le travail de validation restant avant d'autoriser un ordre r\u00e9p\u00e9t\u00e9 sans restriction.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For this component, put the decision at a nozzle passage and attachment feature exposed to process heat. The buyer should ask how the proposed route maintains orifice geometry and attachment alignment under the agreed delivered condition. The supplier should explain the evidence available for the specified material condition and passage cleanliness. If those two answers use different datums, revisions or material conditions, close the discrepancy before accepting the sample. This is a review example, not a claim about an actual Daji customer project.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"plan-a-representative-production-trial\">Planifier un essai de production repr\u00e9sentatif<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A trial for Burner nozzle bodies should use the intended tooling, material condition, finishing route and inspection setup. Record any selective adjustment or special handling needed to make samples acceptable. Decide whether that step belongs in the normal process or indicates an unresolved development issue. The trial should examine the specified material condition and passage cleanliness and demonstrate that orifice geometry and attachment alignment can be produced with the proposed route. Agree how many samples and process conditions are needed to answer the actual risk question. One passing part is evidence of feasibility, while repeatability requires broader evidence.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"check-the-mating-assembly\">V\u00e9rifiez l'assemblage d'accouplement<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Inspecting Burner nozzle bodies in isolation can miss an installation problem. Review the mating parts, assembly sequence, fastener access and the effects of oxidizing gases, thermal cycling and deposits. Determine whether the assembly requires a gap, a contact patch, a preload or a specific alignment. Check that the chosen dimensional controls actually establish those conditions. Where a trial fit is useful, agree the mating-part revision and the permitted adjustments. A successful fit achieved by modifying the mating component should be recorded as a design decision rather than treated as evidence that the original drawing was satisfied.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img decoding=\"async\" width=\"800\" height=\"800\" src=\"https:\/\/dajicasting.com\/wp-content\/uploads\/2026\/09\/oem-1-005.jpg\" alt=\"Inspection dimensionnelle d&#039;un composant coul\u00e9 \u00e0 c\u00f4t\u00e9 des pi\u00e8ces pr\u00e9par\u00e9es pour l&#039;exp\u00e9dition\" class=\"wp-image-738\" srcset=\"https:\/\/dajicasting.com\/wp-content\/uploads\/2026\/09\/oem-1-005.jpg 800w, https:\/\/dajicasting.com\/wp-content\/uploads\/2026\/09\/oem-1-005-300x300.jpg 300w, https:\/\/dajicasting.com\/wp-content\/uploads\/2026\/09\/oem-1-005-150x150.jpg 150w, https:\/\/dajicasting.com\/wp-content\/uploads\/2026\/09\/oem-1-005-768x768.jpg 768w, https:\/\/dajicasting.com\/wp-content\/uploads\/2026\/09\/oem-1-005-600x600.jpg 600w, https:\/\/dajicasting.com\/wp-content\/uploads\/2026\/09\/oem-1-005-100x100.jpg 100w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"review-changes-across-all-operations\">Review changes across all operations<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A change made to improve casting can alter machining access, inspection access or installed fit. For Burner nozzle bodies, assess a nozzle passage and attachment feature exposed to process heat whenever a die insert, gating arrangement, material condition or fixture is revised. Document which characteristics require revalidation and which records need updating. Include subcontracted finishing in the change process. The supplier should know when notification is sufficient and when written technical approval is required. Keep the decision connected to a revision identifier so that old samples and new production cannot be mistaken for the same approved configuration.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"treat-cleaning-as-a-specified-operation\">Traiter le nettoyage comme une op\u00e9ration sp\u00e9cifi\u00e9e<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Define the cleanliness needed for Burner nozzle bodies by its assembly and service requirements. Internal passages, blind holes and intersecting features can retain debris after machining or finishing. Agree access for cleaning and the method used to verify the result. Protect cleaned components during drying, storage and packing. Avoid transferring a generic cleanliness target from another product without checking its meaning. For a component exposed to oxidizing gases, thermal cycling and deposits, remaining contamination may affect seals, lubrication, assembly torque or corrosion behavior in ways that a cosmetic exterior check will not reveal.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"keep-development-and-production-economics-separate\">Gardez l\u2019\u00e9conomie du d\u00e9veloppement et de la<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Tooling and trial costs for Burner nozzle bodies should be assessed over a realistic volume range. Record the ownership and maintenance terms of the die, the cost of a future revision and the assumptions behind quantity pricing. Low initial volume can favor a different development route from a stable repeat program. Compare alternatives on total accepted-component cost and required evidence. Avoid claiming a fixed break-even quantity without a project quotation. The economic decision should reflect orifice geometry and attachment alignment, inspection scope, material utilization and the customer\u2019s actual demand uncertainty.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"decision-checklist-before-release\">Liste de contr\u00f4le de d\u00e9cision avant la lib\u00e9ration<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The release package for burner nozzle bodies should identify the drawing revision, the specified material and condition, the controlled geometry and the agreed acceptance methods. It should make a signed approval package defining what was actually validated easy to retrieve. Record any deviation with its location, reason and authorized disposition. Keep an unresolved performance question separate from a passed dimensional result.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Before committing to production, verify that orifice geometry and attachment alignment has an agreed reference system, that the specified material condition and passage cleanliness has usable acceptance criteria and that the component is evaluated against oxidizing gases, thermal cycling and deposits. If a requirement is still unclear, identify who can resolve it and which manufacturing operation must wait for that decision.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"comparison-of-purchasing-decisions\">Comparaison des d\u00e9cisions d'achat<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>D\u00e9cision<\/th><th>Approche incompl\u00e8te<\/th><th>Preuve d'acceptation utile<\/th><\/tr><\/thead><tbody><tr><td>D\u00e9finition des composants<\/td><td>Prix d'un moulage g\u00e9n\u00e9rique<\/td><td>a nozzle passage and attachment feature exposed to process heat<\/td><\/tr><tr><td>Ajustement fonctionnel<\/td><td>V\u00e9rifier les tailles isol\u00e9es<\/td><td>orifice geometry and attachment alignment<\/td><\/tr><tr><td>Lib\u00e9ration de qualit\u00e9<\/td><td>Recueillir des certificats d'essai non sp\u00e9cifi\u00e9s<\/td><td>the specified material condition and passage cleanliness<\/td><\/tr><tr><td>Cette \u00e9tape de r\u00e9vision<\/td><td>Accepter une assurance fournisseur informelle<\/td><td>un dossier d'approbation sign\u00e9 d\u00e9finissant ce qui a \u00e9t\u00e9 r\u00e9ellement valid\u00e9<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"discuss-your-casting-drawing-with-daji\">Discutez de votre dessin de casting avec Daji<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For burner nozzle bodies, send Daji your controlled drawing, 3D model, material requirements, order quantity and the questions identified during sample qualification. Review the relevant <a href=\"https:\/\/dajicasting.com\/fr\/industries\/moulages-denergie-nouvelle\/\">new energy &amp; power castings<\/a> application et celle de Daji <a href=\"https:\/\/dajicasting.com\/fr\/service-oem\/\">service OEM bas\u00e9 sur le dessin<\/a>. Lorsque les interfaces finales n\u00e9cessitent un usinage, inclure les exigences pour <a href=\"https:\/\/dajicasting.com\/fr\/service-dusinage\/\">Usinage CNC et livraison de pi\u00e8ces finies<\/a>. Demandez \u00e0 l'\u00e9quipe d'ing\u00e9nierie de confirmer la faisabilit\u00e9 et la port\u00e9e du devis par rapport \u00e0 vos sp\u00e9cifications r\u00e9elles.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pour des indications plus larges sur la d\u00e9finition d'un ordre de coul\u00e9e de l'acier, voir le <a href=\"https:\/\/www.sfsa.org\/subject-areas\/education\/ordering-steel-castings\/\" target=\"_blank\" rel=\"noopener\">Conseils d'achat de la Steel Founders\u2019 Society of America<\/a>. Utiliser le dessin applicable et la sp\u00e9cification convenue du produit pour \u00e9tablir les crit\u00e8res d'acceptation de ce composant.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"frequently-asked-questions\">Foire aux questions<\/h2>\n\n\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list\">\n<div id=\"025-faq-1\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What information is needed for burner nozzle bodies sample qualification?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Fournir un dessin et un mod\u00e8le contr\u00f4l\u00e9s, les conditions de service pr\u00e9vues, le mat\u00e9riel et l'\u00e9tat de livraison, les quantit\u00e9s et les dossiers d'acceptation requis Le r\u00e9sultat sp\u00e9cifique pour cette \u00e9tape est un dossier d'approbation sign\u00e9 d\u00e9finissant ce qui a \u00e9t\u00e9 r\u00e9ellement valid\u00e9 Identifier les questions ouvertes avant le d\u00e9but de l'outillage ou de l'op\u00e9ration qu'elles affectent.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"025-faq-2\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Which geometry matters most for burner nozzle bodies?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Review a nozzle passage and attachment feature exposed to process heat. The functional machining priority is orifice geometry and attachment alignment. Tie those features to the installed reference system and confirm that the inspection setup reproduces the agreed drawing interpretation.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"025-faq-3\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">How should the material for burner nozzle bodies be specified?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Use an approved cast-material specification, grade and delivery condition suitable for oxidizing gases, thermal cycling and deposits. Agree the required composition and mechanical-property evidence. A similar wrought designation or a single hardness reading does not establish automatic equivalence.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"025-faq-4\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What evidence should accompany burner nozzle bodies samples?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Include the drawing revision, process route, material and thermal-batch identity, dimensional results and the examinations defined in the order. Give particular attention to the specified material condition and passage cleanliness. Separate sample conformity from any remaining equipment-level validation.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"025-faq-5\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Can Daji review burner nozzle bodies before a production order?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Le flux de travail OEM publi\u00e9 par Daji comprend l'examen des dessins, le d\u00e9veloppement des outils, le moulage, le traitement thermique, l'usinage et la coordination de l'inspection Soumettez les exigences r\u00e9elles des composants afin que l'\u00e9quipe d'ing\u00e9nierie puisse confirmer la port\u00e9e des tol\u00e9rances sp\u00e9cifiques, des tests, des d\u00e9lais et des alternatives de mat\u00e9riaux n\u00e9cessaires \u00e0 la confirmation du projet.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n<div class='fluentform ff-default fluentform_wrapper_1 ffs_default_wrap'><form data-form_id=\"1\" id=\"fluentform_1\" class=\"frm-fluent-form fluent_form_1 ff-el-form-top ff_form_instance_1_1 ff-form-loading ffs_default\" data-form_instance=\"ff_form_instance_1_1\" method=\"POST\" action=\"\" ><fieldset  style=\"border: none!important;margin: 0!important;padding: 0!important;background-color: transparent!important;box-shadow: none!important;outline: none!important; min-inline-size: 100%;\">\n                    <legend class=\"ff_screen_reader_title\" style=\"display: block; margin: 0!important;padding: 0!important;height: 0!important;text-indent: -999999px;width: 0!important;overflow:hidden;\">\u5b98\u7f51\u8be2\u76d8<\/legend>        <div\n                style=\"display: none!important; position: absolute!important; transform: translateX(1000%)!important;\"\n                class=\"ff-el-group ff-hpsf-container\"\n        >\n            <div class=\"ff-el-input--label asterisk-right\">\n                <label for=\"ff_1_item_sf\" aria-label=\"Notifier\">\n                    Notifier                <\/label>\n            <\/div>\n            <div class=\"ff-el-input--content\">\n                <input type=\"text\"\n                       name=\"item_1__fluent_sf\"\n                       class=\"ff-el-form-control\"\n                       id=\"ff_1_item_sf\"\n                \/>\n            <\/div>\n        <\/div>\n        <input type='hidden' name='__fluent_form_embded_post_id' value='1757' \/><input type=\"hidden\" id=\"_fluentform_1_fluentformnonce\" name=\"_fluentform_1_fluentformnonce\" value=\"d1c7cdeb96\" \/><input type=\"hidden\" name=\"_wp_http_referer\" value=\"\/fr\/wp-json\/wp\/v2\/posts\/1757\" \/><div data-name=\"ff_cn_id_1\"  class='ff-t-container ff-column-container ff_columns_total_3'><div class='ff-t-cell ff-t-column-1' style='flex-basis: 33.33%;'><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_1_input_text' id='label_ff_1_input_text' aria-label=\"Nom\">Nom<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"input_text\" class=\"ff-el-form-control\" placeholder=\"Nom\" data-name=\"input_text\" id=\"ff_1_input_text\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><\/div><div class='ff-t-cell ff-t-column-2' style='flex-basis: 33.33%;'><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_1_email' id='label_ff_1_email' aria-label=\"Courriel\">Courriel<\/label><\/div><div class='ff-el-input--content'><input type=\"email\" name=\"email\" id=\"ff_1_email\" class=\"ff-el-form-control\" placeholder=\"Adresse e-mail\" data-name=\"email\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><\/div><div class='ff-t-cell ff-t-column-3' style='flex-basis: 33.33%;'><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_1_phone' id='label_ff_1_phone' aria-label=\"T\u00e9l\u00e9phone\/Mobile\">T\u00e9l\u00e9phone\/Mobile<\/label><\/div><div class='ff-el-input--content'><input name=\"phone\" class=\"ff-el-form-control ff-el-phone\" type=\"tel\" placeholder=\"Num\u00e9ro Mobile\" data-name=\"phone\" id=\"ff_1_phone\" inputmode=\"tel\"  aria-invalid='false' aria-required=\"true\"><\/div><\/div><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_1_message' id='label_ff_1_message' aria-label=\"Votre Message\">Votre Message<\/label><\/div><div class='ff-el-input--content'><textarea aria-required=\"true\" aria-labelledby=\"label_ff_1_message\" name=\"message\" id=\"ff_1_message\" class=\"ff-el-form-control\" placeholder=\"Votre Message\" rows=\"4\" cols=\"2\" data-name=\"message\" ><\/textarea><\/div><\/div><div class='ff-el-group ff-text-left ff_submit_btn_wrapper'><button type=\"submit\" class=\"ff-btn ff-btn-submit ff-btn-md ff_btn_style\"  aria-label=\"Soumettre Formulaire\">Soumettre Formulaire<\/button><\/div><\/fieldset><input type=\"hidden\" name=\"trp-form-language\" value=\"fr\"\/><\/form><div id='fluentform_1_errors' class='ff-errors-in-stack ff_form_instance_1_1 ff-form-loading_errors ff_form_instance_1_1_errors'><\/div><\/div>            <script type=\"text\/javascript\">\n                window.fluent_form_ff_form_instance_1_1 = {\"id\":\"1\",\"ajaxUrl\":\"https:\\\/\\\/dajicasting.com\\\/wp-admin\\\/admin-ajax.php\",\"settings\":{\"layout\":{\"labelPlacement\":\"top\",\"helpMessagePlacement\":\"with_label\",\"errorMessagePlacement\":\"inline\",\"cssClassName\":\"\",\"asteriskPlacement\":\"asterisk-right\"},\"restrictions\":{\"denyEmptySubmission\":{\"enabled\":false}}},\"form_instance\":\"ff_form_instance_1_1\",\"form_id_selector\":\"fluentform_1\",\"rules\":{\"input_text\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"email\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"},\"email\":{\"value\":true,\"message\":\"This field must contain a valid email\",\"global\":false,\"global_message\":\"This field must contain a valid email\"}},\"phone\":{\"required\":{\"value\":true,\"global\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\"},\"valid_phone_number\":{\"value\":false,\"global\":true,\"message\":\"Phone number is not valid\",\"global_message\":\"Phone number is not valid\"}},\"message\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"}}},\"debounce_time\":300,\"file_upload_settings\":[]};\n                            <\/script>","protected":false},"excerpt":{"rendered":"<p>The sample qualification decision for burner nozzle bodies Burner nozzle bodies need sample qualification that accounts for a nozzle passage and attachment feature exposed to process heat. The component may face oxidizing gases, thermal cycling and deposits; those conditions shape what must be defined before a purchase order can describe an acceptable part. This guide [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1499,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","rank_math_title":"Burner nozzle bodies Sample Qualification","rank_math_description":"Plan sample qualification for burner nozzle bodies. Review critical geometry, casting requirements and acceptance evidence before ordering.","rank_math_canonical_url":"https:\/\/dajicasting.com\/burner-nozzle-bodies-sample-qualification\/","rank_math_focus_keyword":"burner nozzle bodies sample qualification,energy stainless steel casting"},"categories":[27],"tags":[],"class_list":["post-1757","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-precision-casting-components"],"_links":{"self":[{"href":"https:\/\/dajicasting.com\/fr\/wp-json\/wp\/v2\/posts\/1757","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dajicasting.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dajicasting.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dajicasting.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dajicasting.com\/fr\/wp-json\/wp\/v2\/comments?post=1757"}],"version-history":[{"count":1,"href":"https:\/\/dajicasting.com\/fr\/wp-json\/wp\/v2\/posts\/1757\/revisions"}],"predecessor-version":[{"id":2293,"href":"https:\/\/dajicasting.com\/fr\/wp-json\/wp\/v2\/posts\/1757\/revisions\/2293"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dajicasting.com\/fr\/wp-json\/wp\/v2\/media\/1499"}],"wp:attachment":[{"href":"https:\/\/dajicasting.com\/fr\/wp-json\/wp\/v2\/media?parent=1757"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dajicasting.com\/fr\/wp-json\/wp\/v2\/categories?post=1757"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dajicasting.com\/fr\/wp-json\/wp\/v2\/tags?post=1757"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}